Kempton Street will be closed from April 8 through 12 for the installation of a box culvert. The installation of this box culvert is part of the Camden Drive Outfall Project Phase I in the Holley by the Sea subdivision. It is the first of a two-phase project to improve stormwater conveyance and water quality of adjacent wetlands. The project includes paving Camden Dr. from Indian St. to Kempton St. and upgrading existing drainage culverts.
Motorists are asked to follow detour routes and use caution while driving. For more information, contact Michael Schmidt, 850-981-7100.