Henry St./Forsyth St. over Pond Creek closed Mar. 28-29 | 3/25/2022 7:00 AM |
FDOT closing Coldwater Church Road for cross drain replacement Mar. 28-29 | 3/24/2022 2:20 PM |
REMINDER: East Bay Blvd. to close for pedestrian bridge installation | 3/24/2022 9:10 AM |
Cove Road closure for cross drain replacement Mar. 28-31 | 3/24/2022 7:19 AM |
Chumuckla Highway now open at Tunnel Road following accident | 3/21/2022 11:36 AM |
Chumuckla Highway closed at Tunnel Road due to accident | 3/21/2022 8:56 AM |
East Bay Blvd. to close for pedestrian bridge installation | 3/18/2022 7:30 AM |
Henry St. through Forsyth St. extended closure for FPL work | 3/16/2022 2:26 PM |